My name is Ed Crumpton and I'm a artist based in the South-West, England, UK. I am looking for a UK-based chartered structural engineer (with PI insurance) to support the delivery of Quay Sounds, an interactive public art sculpture commissioned by North Devon Council as part of the Flourishing Barnstaple programme.
The sculpture involves two horn-like copper forms (approx. 1.8m and 1.4m high, see attached photo) with a (stainless) steel internal frame, anchored into a concrete pad (installed by council contractors).
This is the scope of Work:
- Review provided drawings (Rhino, exploded views) and material details. - Confirm the suitability of using steel vs stainless steel for the internal frame. - Assess the copper cladding shell and advise on fixing point suggestions. -- Design of internal structural frame (steel/stainless) to meet safety requirements. -- Design of base plate and fixings into a reinforced concrete base.
Provide structural calculations and report in line with Eurocode standards (EN 1990, EN 1991, EN 1993, EN 1997).
Advise on the best method to attach the structure to the floor (anchoring/fixings).
Specify materials to ensure a 20-year design life (including considerations for marine exposure, corrosion, vandalism, and thermal expansion). I am particularly concerned about people jumping and swinging from it.
Provide signed documentation with Professional Indemnity insurance suitable for submission to North Devon Council.
Important Notes:
Copper cladding is non-structural, but advice is needed on its attachment method to the frame. I have looked this website for more help in finding proper fixing point on a copper roof - https://copper.org/applications/architecture/arch_dhb/arch-details/basic_details/fasteners.php
The foundation design is excluded (the council will provide this).
I'm looking for a reference for UK-based engineers to ensure reassurance.
Deliverables:
Structural calculation report and compliance certificate.
Advice on structural frame material, anchoring, and copper reinforcement.
Anchorage load data for council contractors.
Budget & Timeframe:
Looking at budgets of £1,000–£2,000 based on scope and experience.
Delivery: ideally within 2 weeks of posting, latest 19th September.
Location propoed on what 3 words - ///tolls.files.cargo
Plastic Prototype Category: 3D CAD, 3D Design, 3D Modelling, 3D Printing, CAD / CAM, Manufacturing Design, Mechanical Engineering, Product Design, Prototyping, Solidworks Budget: $250 - $750 AUD
23 Mar 2026 11:04 GMT
Modern G+8 Mixed Use Blueprint Category: Architectural Engineering, AutoCAD, Building Architecture, Building Design, Building Information Modeling, Construction Management, Home Design, Interior Design Budget: $10 - $30 USD
Engaging Video Editing & Effects Category: Adobe Premiere Pro, After Effects, Motion Graphics, Video Editing, Video Post Editing, Video Processing, Video Production, Video Services Budget: ₹12500 - ₹37500 INR
DNS Records Update for Email Category: Cloud Computing, DNS, Linux, Microsoft 365, Network Administration, Network Security, System Admin, Windows Server Budget: £20 - £250 GBP
23 Mar 2026 11:00 GMT
Canadian LinkedIn Engagement Assistant Category: Analytics, Content Strategy, Digital Marketing, Facebook Marketing, Social Media Management, Social Media Marketing, Twitter, Virtual Assistant Budget: $250 - $750 USD
News Clip Research for Political Ads Category: Content Creation, Content Strategy, Data Entry, Excel, Google Sheets, Journalism, Research, Video Editing, Video Production, YouTube Budget: $250 - $750 USD
23 Mar 2026 10:56 GMT
Instagram Fitness Testimonial Videos Category: Content Creation, Instagram Marketing, Social Media Marketing, Video Ads, Video Editing, Video Post Editing, Video Processing, Video Production, Video Services, Videography Budget: £20 - £250 GBP
23 Mar 2026 10:54 GMT
Franchise Agreement Word Formatting Category: Editing, Legal, Legal Writing, Microsoft Word, Proofreading, Typography, Word, Word Processing Budget: ₹600 - ₹1500 INR
23 Mar 2026 10:54 GMT
Enterprise OS Project Report Creation -- 2 Category: Business Analysis, Cloud Computing, Documentation, Project Management, Report Writing, Research Writing, Software Architecture, Technical Writing Budget: ₹37500 - ₹75000 INR